Product Code: HR CUP LOCK 6
For the production of cup lock scaffolding, six pieces of sheet metal pieces are welded to 48 X 3,16 pipes at 50 cm intervals. Produces 1 product in 1 minute.
GRASS GROUP COMPANY
Asteknik Mühendislik A.Ş.
REİS MAKİNA
Beydemir® Sac Profil San. Tic. A.S.
KATEK AĞAOĞLU KAUÇUK TEKNOLOJİLERİ SAN. TİC. LTD. ŞTİ.
MODSTEEL PREFABRIK MODÜLER ÇELIK INSAAT VE IHR. LTD.
PATENT MÜH. MAK. İNŞ. SAN. TİC. LTD. ŞTİ